
Friday, September 21, 2007
Thursday, September 20, 2007
Site Plan
The landscape plan designs on the South sides are to invite the foot traffic to enter the building. The pavement and the box planter are built around the building perimeter and terminates at the two main entrances, one is intended for private access, (mainly for the distance student for easy access to the classroom and support areas), and the other one is for public entrance where the cafe and gallery are welcoming the visitors.
Underground parking for the building occupants are accessible from Ipswich Street. Retaining wall is built for vehicle safety purposes and on the other side of the wall it have green-screen system. The purpose of green-screen system to help Pines on the north side to improve the air quality around the building, and gives a pleasant look from the highway traffic. The types of plants that can grow for the green-screen and can withstand the New England weathers are Wisteria, Boston ivy, and English ivy.
The ideal of natural soil profile for planting to include layers of organic, topsoil, subsoil substratum and followed by bedrock.
Pervious paving to be use to reduce storm water runoff.
Tuesday, September 18, 2007
3rd Revision Floor Plan



Sunday, September 16, 2007
Rainscreen System
Friday, September 14, 2007
Structural Drawing


I'm using steel construction for the building materials, due to the benefits of :
1. Strength. (the site situated next to railroad, and highway, lots of vibration, and movements to the new building) Steel characteristic are manufactured without any twisting, warping that can be found in wood.
2. Fire Safety. In comparison to wood, steel is non combustable, nor provide additional fuel to the fire.
3. Resilient to creatures infestation.
4. Environmental benefits.
-There is more steel recycled in North America each year than aluminum, plastic and glass combined. Each year, steel recycling saves the energy equivalent to electrically powering about 1/5 of the households in the USA for one year.
-Steel recycling programs reduce the solid waste stream resulting in saved landfills space and conservation of natural resources.
-In 1999, steel plates and beams used in construction were recycled at a rate of 95% also rebar and other steel construction material posted a recycling rate of 45%.
-14.2 million cars were recycled in 1999 (enough to circle earth 1-3/4 times) and every ton saves 2,500 pounds of iron ore, 1,400 pounds of coal and 120 pounds of lime stone.
Although there are also many advantage of using wood for the construction, but I feel Steel constructions are the best method for my building.
Wednesday, September 12, 2007
Tuesday, September 11, 2007
First Floor Plan

Green Screen Detail
The existing site located next to the railroad and highway traffic. For the comfort of the new building occupant, I thought it is necessary to some type of screen system to reduce the amount of the dusts and the noise that can enter into the building. So, upon my research there are products called green screen panels that can receive flowering and deciduous vines planted into the screen to reduce dusts and to improve the air quality. Not so much for aesthetic but I think this system is crucial for the comfort, and integrated well with the overall design.For product info : http://www.greenscreen.com/home.html
Monday, September 10, 2007
Re-visit 2nd Floor Plan
This is the latest set of my second floor plan. It has been change from my previous floor plan.In terms of programs I think I had included all the necessary spaces and necessities for the students. Overall, I really think this plan will work in terms of layout and accessibilities and concept wise.
The main programs are divided into 3 bars. The first 2 bars for student living area, and 1 bar that is open for public and privete.
Having a corridor on the North side for student access to computer room, storage room, recreation room and access to the Main lecture area.
The area between the bars are small garden space that are sloping 2 feet below the finished 2nd floor, to create enough opening for the light to penetrate the first floor. This is my solution to
let the light to enter the building but also to control the amount of light that can enter to the first floor.
I treated the last bar as the celebration piece (Main Lecture area) where the public space collides with the private space (back to the concept that I have to connect Public vs. Private in vertical manner) The Lecture hall are open for public/private meeting, distinguished lecturer, presentation, education etc.
Building Section
Saturday, September 8, 2007
Roof Detail
PV(photovoltaics) elements actually become an integral part of the building, by having dual functions. Not only to serve as the building envelope material, actually the PV roof system also serves as a power generator. Having the PV oriented to Southern exposure, to maximize the solar gain, while having glazing to the Northern exposure to achieve natural lighting into the buildingThe power that are generated by the PV can obtain proximately from 3-5 kilowatts per square meter of solar energy.
On a replacement basis, PV power is cheap. It takes about twenty years to replace the entire array. Such a program would guarantee level electrical output forever. And what would the cost be in this scenario? Only 5% of installation costs, or less than one cent per kWh! That is why PV electricity is a compelling long-term investment and energy efficiency.
Friday, September 7, 2007
Sneak peak (more progress is coming)
Thursday, September 6, 2007
From Intensive comments
-How do you get light inot the ground floor from the South?
-What are the materials for the exterior?
-What are the openings in the south facade?
-Computer room and sleeping area should be articulated differently in the second floor?
-Try to engage public/private space in vertical manner?
-Why is there a hamster in your parking garage?
-Maybe vertical circulation can occur between sleeping stripes?
-Begin to play with slices up and down (ramps like in second floor roof deck)
-Very nice diagrams explaining your concept, but I would like to see what type of materials for the building.











